home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V11_2 / V11_255.TXT < prev    next >
Internet Message Format  |  1991-07-08  |  19KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/0a9KGIi00VcJE0j049>;
  5.           Fri, 13 Apr 90 01:33:09 -0400 (EDT)
  6. Message-ID: <Ua9KFqS00VcJQ0hE5b@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Fri, 13 Apr 90 01:32:39 -0400 (EDT)
  11. Subject: SPACE Digest V11 #255
  12.  
  13. SPACE Digest                                     Volume 11 : Issue 255
  14.  
  15. Today's Topics:
  16.                Reuse of ICBMs?
  17.               Re: National Space Society
  18.           Space Shuttle Development (5 of 7)
  19.               Re: National Space Society
  20.             Re: Vandeburg Launch Schedules
  21.            Re: JSC newsletter summary, 23 March 90
  22.             subscribe Dan Stratton
  23.      Re: AIR FORCE USES ICBM ROCKET TO LAUNCH RESEARCH SATELLITES
  24.            Re: Pegsat Update (Forwarded) - 04/09/90
  25.           Space Shuttle Development (1 of 7)
  26. ----------------------------------------------------------------------
  27.  
  28. Date: 12 Apr 90 17:43:31 GMT
  29. From: alan@apple.com  (Alan Mimms)
  30. Subject: Reuse of ICBMs?
  31.  
  32. I was wondering something the other day: What's going to happen to all
  33. of those ICBMs now that Peace is breaking out?  Do the arms limitation
  34. talks REQUIRE that they be sawed into lotsa littlebitty pieces?  Is
  35. there a way to assure that they don't have to be cut up somehow and
  36. still retain verifiable compliance with the arms limitation talks?
  37.  
  38. I guess the real question might be: can those ICBMs be put into service
  39. as rockets to deliver PEACEFUL payloads to orbit?  If so, I would think
  40. the cost to orbit would go down DRASTICALLY since all that MILspec
  41. hardware is just lying around waiting for someone to put it on a launch-
  42. pad and torch it...
  43.  
  44. Am I missing something?
  45.  
  46. Alan Mimms                                      My opinions are generally
  47. Communications Product Development Group        pretty worthless, but
  48. Apple Computer                                  they *are* my own...
  49.                                                 ^
  50. EH AT 48?
  51.  
  52. ------------------------------
  53.  
  54. Date: 12 Apr 90 18:47:12 GMT
  55. From: zaphod.mps.ohio-state.edu!usc!venera.isi.edu!cew@tut.cis.ohio-state.edu  (Craig E. Ward)
  56. Subject: Re: National Space Society
  57.  
  58. In article <7827@celit.fps.com> dave@fps.com (Dave Smith) writes:
  59. >In article <12811@venera.isi.edu> cew@venera.isi.edu (Craig E. Ward) writes:
  60. >> [...]  In this case, the
  61. >>National Space Society is trying to promote itself using tested and reliable
  62. >>tactics.  
  63. >
  64. >Yes, agreed.  The survey, however, is designed to produce specific responses
  65. >from the respondent.
  66.  
  67. That is the way targeted mass mailings work.  Expecting the same approach to
  68. work with every person is silly.  You were are obviously mistargeted (as Mr.
  69. Henson would be also).
  70.  
  71. >>The NSS should be given some good marks for at
  72. >>least trying to broaden its support with proven methods.
  73. >
  74. >Agreed.  As someone pointed out in e-mail to me, every organization needs
  75. >sheep.  This is fine.  However, I don't like their agenda as shown to me 
  76. >from that survey
  77.  
  78. You need be careful about judging the whole program from such a narrow slice
  79. of information.  Commercial space receives good and positive coverage in the
  80. Society's magazine, Ad Astra.
  81.  
  82. Ad Astra has a regular column on commercial space development called
  83. "Enterprises."  Articles about private enterprise space development show up
  84. regularly and the December 1989 issue was all commercial.  These were the
  85. featured articles:
  86.  
  87.     "For Sale: Commercial Space," by John J. Egan
  88.     "Need Money? Good Luck!," by Lori Keesey
  89.     "Space Commerce, Soviet Style," by Jan Goldman
  90.     "Marketing the Proton," by Seth Arenstein
  91.  
  92. This is from NSS president Charles Walker's column in the same issue:
  93.  
  94.     "So how do we accomplish commercialization?  Back to the future!
  95.     Uncle Sam, you demonstrate expensive and risky technology; when
  96.     there are realistic markets, help industry take it over and provide
  97.     it with the necessary support, then get out of the way.  Let
  98.     entrepreneurs try and succeed (or fail) on their own in attempting
  99.     the 'impossible.'  Use a national space lottery to raise capital.
  100.     Give classified technology that is militarily obsolete to the private
  101.     sector, and, for God's sake, not to mention our own, grow up and
  102.     learn that 'not invented here' means 'we lose!'"
  103.  
  104. Doesn't look like a "government-only" program to me.
  105.  
  106. Furthermore, NSS has a chapter system and many are deeply interested in
  107. private commercial development.  Using NSS chapter contacts, Denver based
  108. Galactic Mining Industries contacted me when their head research came to Los
  109. Angeles in search of sub-contracts for the space station.  They are marketing
  110. an alternate technique for manufacturing parts for the station.  The central
  111. process is something called "chemical vapor deposition" (CVD).  It was a
  112. very interesting presentation.  (I've used up my news quote for the day.
  113. I'll try to get around to GMI and CVD next week.)  The point being that they
  114. wouldn't waste their time on a NASA fan club.
  115.  
  116. >>The National Space Society is a pluralistic organization that has to balance a
  117. >>wide variety of views and interests.  I believe it is fast becoming the
  118. >>paramount space activist group in the world.  It can be an important tool for
  119. >>"creating a spacefaring civilization that will establish communities beyond
  120. >>the Earth."
  121. >
  122. >I'd like to believe so.  They've gotten off on the wrong foot with me,
  123. >however, and maybe with a lot of other people too.
  124.  
  125. Mass marketing won't please everybody and by its nature, can not easily show
  126. a full picture.  I'm putting time into this article to round out that
  127. picture.  I hope you better feeling about NSS now.
  128.  
  129. If you, or anybody else out there, wish to join the addresses are:
  130.  
  131. The National Space Society            OASIS
  132. 922 Pennsylvania Ave. S.E.    or my chapter:    P.O. Box 1231
  133. Washington, D.C. 20003-2140            Redondo Beach, CA 90278
  134. (202) 543-1900                    (213) 374-1381
  135.  
  136. The NSS has about 120 chapters worldwide.  (Besides the US, there are
  137. chapters in Australia, Canada, Ecuador, Sweden, UK, and West Germany.)  If
  138. you're not in the LA area, you can call Washington and ask for the nearest
  139. chapter.
  140.  
  141. -- 
  142. Craig E. Ward <cew@venera.isi.edu>     Slogan:    "nemo me impune lacessit"
  143. USPS:    USC/Information Sciences Institute
  144.     4676 Admiralty Way, Suite 1100
  145.     Marina del Rey, CA 90292
  146.  
  147. ------------------------------
  148.  
  149. Date: 12 Apr 90 01:53:56 GMT
  150. From: usc!zaphod.mps.ohio-state.edu!sdd.hp.com!elroy.jpl.nasa.gov!zardoz.cpd.com!dhw68k!ofa123!Wales.Larrison@apple.com  (Wales Larrison)
  151. Subject: Space Shuttle Development (5 of 7)
  152.  
  153.  
  154.   At the end of the formal Phase B studies in 1971, several 
  155. conclusions were reached.  Primary among them was that the 2 stage, 
  156. fully reusable system had a high development cost, required multiple 
  157. concurrent technology developments, and had a relatively high 
  158. technology risk.  Development costs could exceed $2 billion at the 
  159. peak year.  The political feasibility of the 2 stage fully reusable 
  160. design ended when, in 1971,  the OMB capped the NASA budget for all 
  161. programs not to exceed $3.2 billion, and would not increase this 
  162. level in the foreseeable future. 
  163.   An alternative configuration studied in the Phase A extension 
  164. studies using an expendable external fuel tank was felt to have lower 
  165. development costs and lower technology risks.  However, this decision 
  166. bumped the Phase B studies back to the starting point.  All of the 
  167. Phase B studies were extended for another year.  NASA baselined the 
  168. external tank approach in August 1971 and began to look at variations 
  169. on the differing booster and shuttle designs to reduce the system 
  170. development costs, while still getting as much utility out of the 
  171. vehicle as possible. 
  172.    An external fuel tank, by putting more than 80% of the mass that 
  173. was to be accelerated into a flexible design envelope, reduced the 
  174. system sensitivity to the critical uncertainties of orbiter inert 
  175. weight growth, and main engine performance shortfall.  While these 
  176. design factors had been massively analyzed, the system design was 
  177. found to be very sensitive to these.  Since all uncertainties could 
  178. not be eliminated without actually building and testing a system (and 
  179. there was no money for doing this), NASA chose to pick a system that 
  180. was the least sensitive to these uncertainties. This approach however, 
  181. complicated the operations, and increased the recurring cost. 
  182.   (Note: using 20:20 hindsight, the engine performance has technically 
  183. been right on.  Engine recurring cost has exceeded its expected 
  184. levels, since the approach taken was to not risk performance in favor 
  185. of lower costs.  Similarly, the orbiter inert weight has grown 
  186. approximately 2 % over the expected weight set in 1971 - primarily due 
  187. to uncertainties in the aerodynamics and aerothermal environments.  
  188. Prior to the shuttle, the X-15 had provided data up to about Mach 7, 
  189. but the entry environment from Mach 7-25 was pretty much unknown, and 
  190. almost impossible to simulate on the ground.  Again, the decision was 
  191. made to design heavier structures and less maintainable systems to 
  192. encompass the range of these uncertainties - reducing the development 
  193. risk and cost, while increasing the recurring costs from continuing 
  194. operations.  NASA's priority was not on the operational 
  195. characteristics of the vehicles - and this would come back to haunt 
  196. them in complex and high cost operations for the system. 
  197.   For Booster design, the reusable booster design had been ruled out 
  198. as too expensive to develop (although everyone involved agreed it 
  199. would be cheaper to operate flight-to-flight).  After several design 
  200. iterations, a design emerged based upon Grumman and MDAC analyses 
  201. which used an expendable booster burning in parallel to the orbiter 
  202. during first stage flight. It seemed to provide the most capability, 
  203. with the minimum development cost, although every assessment showed it 
  204. had a higher recurring cost. 
  205.   Cost awareness was very apparent at NASA.  NASA's guidelines in 
  206. August 1971 included:
  207.   "o Don't exceed much over $1 B in any year
  208.    o Keep total costs below $12 B for 445 flights
  209.    o Keep Risks Low - don't do a great deal more than we have 
  210.      demonstrated before 
  211.    o Keep flexible to vary costs with traffic demands"
  212.                                         (Cont)
  213.  
  214.  
  215. --- Opus-CBCS 1.10
  216.  * Origin: Universal Electronics, Inc. (1:103/302.0)
  217. --  
  218. Wales Larrison
  219. ...!{dhw68k,zardoz,lawnet,conexch}!ofa123!Wales.Larrison                             Wales.Larrison@ofa123.FIDONET.ORG
  220. 714 544-0934 2400/1200/300
  221.  
  222. ------------------------------
  223.  
  224. Date: 12 Apr 90 15:05:52 GMT
  225. From: zaphod.mps.ohio-state.edu!sol.ctr.columbia.edu!IDA.ORG!pbs!pstinson@tut.cis.ohio-state.edu
  226. Subject: Re: National Space Society
  227.  
  228. In article <28797@cup.portal.com>, hkhenson@cup.portal.com (H Keith Henson) writes:
  229. > After reading the posted survey/membership recrutement form from NSS, *I*
  230. > wouldn't join it.  Keith Henson
  231. I joined this group when it was still the National Space Institute, before the
  232. merger with L5.  As an active member I did not get the survey currently posted
  233. in the net.  The one members received not long ago was much more thought
  234. provoking.  I am sorry I don't still have a copy of it.  It was very well done. 
  235. One question I remember was: Given $100 how would you spend it on the
  236. following projects. (Listed were areas such as Space Commercialization,
  237. Space Station Freedom, Moonbase, Mission to Mars, Unmanned spaceprobes to the
  238. planets etc. ... [As I said, I don't have the form in front of me now, to quote 
  239. from it.]) Anyway, the question forced you to think about where you wanted the
  240. space program to go, which projects you considered more important and which
  241. you would appropriate more funds for at the expense of something else.  There
  242. was no "right" answer and no "cheerleading".  I quess you have to already be a
  243. member to get the quality surveys.  Please do not judge this organization by
  244. the fiasco that was sent out to "attract" new members.
  245.  
  246. ------------------------------
  247.  
  248. Date: 12 Apr 90 20:41:37 GMT
  249. From: serre@boulder.colorado.edu  (SERRE GLENN)
  250. Subject: Re: Vandeburg Launch Schedules
  251.  
  252. >anyone know the likelyhood of being able to witness such launches? 
  253. >
  254. >John Sergneri            "Final Note: Capitalism, for good or ill, is the 
  255. >uunet!acad!johns          river in which we sink or swim, and stocks the
  256. >                          supermarket."  ROZZ-TOX Manifesto - Gary Panter
  257.  
  258. I don't think that you'll actualy be able to get onto the base to watch a 
  259. launch (but I could be wrong, having never tried), but you would get a good
  260. view if you could rent a boat and park off the Vandenberg shoreline while
  261. a launch was occuring.  
  262.  
  263. --Glenn Serre
  264. serre@tramp.colorado.edu
  265.  
  266. ------------------------------
  267.  
  268. Date: 10 Apr 90 22:04:41 GMT
  269. From: mstar!mstar.morningstar.com!bob@tut.cis.ohio-state.edu  (Bob Sutterfield)
  270. Subject: Re: JSC newsletter summary, 23 March 90
  271.  
  272. In article <21674@nuchat.UUCP> steve@nuchat.UUCP (Steve Nuchia) writes:
  273.    The Air Force has a Kevlar "inflatable emergency depth chamber" [???]
  274.  
  275. Possibly a portable decompression bag, for use in treating the
  276. "bends"?  Bent divers, having arisen from the depths too quickly to
  277. divest themselves of excess dissolved nitrogen in their bloodstreams,
  278. enter the bag.  They're already curled up, so it doesn't need to be
  279. too big :-(  It is sealed and pressurized, then the diver is brought
  280. back to surface pressure at a slower controlled rate.  A Kevlar bag
  281. and connected tank would be a lightweight, portable version of a
  282. lifesaving device that used to take up much of the deck of a rescue
  283. boat.
  284.  
  285. ------------------------------
  286.  
  287. Date: 12 Apr 90 13:24 +0000
  288. From: STRATTOND%AC%CSC@CSC.ISU.EDU
  289. Subject: subscribe Dan Stratton                                      
  290. X-Hpdesk-Priority: 3
  291. X-Hpdesk-System: 5
  292. X-Hpdesk-Date: 12 Apr 90 13:24 +0000
  293.  
  294.  
  295. Please add me to the list.  Thank you.
  296. Strattond@csc.isu.edu
  297.  
  298. ------------------------------
  299.  
  300. Date: 12 Apr 90 14:47:06 GMT
  301. From: serre@boulder.colorado.edu  (SERRE GLENN)
  302. Subject: Re: AIR FORCE USES ICBM ROCKET TO LAUNCH RESEARCH SATELLITES
  303.  
  304. In article <9004121344.AA15131@stdc.jhuapl.edu> jwm@STDC.JHUAPL.EDU (Jim Meritt (381-3551)) writes:
  305. >
  306. > VANDENBERG AIR FORCE BASE, Calif (APR 11) AP -- A 29-year-old Atlas rocket
  307. >that once served as an Intercontinental Ballistic Missile (ICBM), armed with
  308. ...
  309. >   The 91-foot-tall Atlas-E, topped by a 5-foot-tall Scout-Altair upper stage
  310. >booster, blasted off the pad at Space Launch Complex 3 at 8 am PDT (1500 GMT),
  311. >
  312. >Something useful!
  313.  
  314. Ha! The Titan II, also a former ICBM, blasted off last September and didn't
  315. need some other upper stage to help get the payload into orbit. :-)
  316.  
  317. On a slightly more serious note, I hear that these ICBM conversions cost about
  318. the same as buying a new Delta, so these former ICBM launches are basically PR.
  319.  
  320. --Glenn Serre
  321. serre@tramp.colorado.edu
  322.  
  323. ------------------------------
  324.  
  325. Date: 12 Apr 90 18:31:14 GMT
  326. From: ccncsu!ncr-fc!mikemc@boulder.colorado.edu  (Mike McManus)
  327. Subject: Re: Pegsat Update (Forwarded) - 04/09/90
  328.  
  329. In article <3344@jato.Jpl.Nasa.Gov> baalke@mars.jpl.nasa.gov (Ron Baalke) writes:
  330. >   being analyzed.  The two chemical release events will occur over
  331. >   Northern Canada between April 14-28, local weather permitting.
  332.  
  333. I've heard a lot about the planned barium (right?) release, but nothing about
  334. why it's being done.  What is this experiment for?  Thanks!
  335.  
  336. --
  337. Disclaimer: All spelling and/or grammer in this document are guaranteed to be
  338.             correct; any exseptions is the is wurk uv intter-net deemuns.
  339.  
  340. Mike McManus (mikemc@ncr-fc.FtCollins.ncr.com)  
  341. NCR Microelectronics                
  342. 2001 Danfield Ct.                   ncr-fc!mikemc@ncr-sd.sandiego.ncr.com, or
  343. Ft. Collins,  Colorado              ncr-fc!mikemc@ccncsu.colostate.edu, or
  344. (303) 223-5100   Ext. 360           uunet!ncrlnk!ncr-sd!ncr-fc!garage!mikemc
  345.  
  346. ------------------------------
  347.  
  348. Date: 12 Apr 90 01:42:51 GMT
  349. From: pacific.mps.ohio-state.edu!zaphod.mps.ohio-state.edu!sdd.hp.com!elroy.jpl.nasa.gov!zardoz.cpd.com!dhw68k!ofa123!Wales.Larrison@tut.cis.ohio-state.edu  (Wales Larrison)
  350. Subject: Space Shuttle Development (1 of 7)
  351.  
  352.  
  353.   Someone on the net has asked for some references for past shuttle
  354. design studies.  A couple of years ago I was digging into the design
  355. ofthe space shuttle system, and had a couple of references folks might
  356. find useful.
  357.  
  358.   Simplest, most accessible references, which cover a good range of
  359. the overall technical and political decisions that went into the Space
  360. Shuttle design decisions:
  361.     "Enterprise" by J. Grey (avail in most large public libraries)
  362.     "The Decision to Develop the Space Shuttle", by J.M. Logsdon,
  363. Space Policy, May 1986
  364.     " The Space Shuttle Program: A Policy Failure?", Science, 30 May
  365. 1986
  366.     "Engineering Design and Political Choice: the Space Shuttle 1969-
  367. 1972", by S. Pace (yes, the "Great Satan" himself), published as an
  368. AIAA historical paper 1984, and as a MIT master's thesis, 1982
  369.     2 articles by C. Barfied in "National Journal", 12 and 19 Aug 72
  370.  
  371.   Other good articles:
  372.  
  373.     "Evolution of the Space Shuttle Design", by J.P. Loftus, S.M.
  374. Andrich, M.G. Goodhard, and R.C. Kennedy
  375.     "The Space Shuttle - Some Key Program Decisions", by R.F.
  376. Thompson (1984 Von Karman Lecture)
  377.     "Progress of manned space flight from Apollo to Space Shuttle", by
  378. A. Cohen (1984 Von Karman lecture)
  379.     "The Space Shuttle Focused Technology Program: Lessons Learned"
  380. Aeronautics and Astronautics,  Feb 1983
  381.  
  382.   If the forum will indulge me, I'd like to also add a few more
  383. comments on the design process that was followed.  This is synopsized
  384. from the above articles, plus some more digging I've done on my own
  385. into the data available (including requesting and reading a fair num-
  386. ber of the supporting contract reports, study assessments, economic
  387. analyses, and industry proposals - plus talking to some of the key
  388. participants).
  389.  
  390.   NASA typically follows what is known as a "Phased Development"
  391. program.  The rules for this are outlined in OMB circular A-109.
  392. Typically, there are initial small technology studies and small design
  393. studies.  To begin the process, a Phase-A study is let for "Concept
  394. Exploration", which tries to establish if a concept is feasible, and
  395. what its primary design constraints and requirements might be.  A
  396. Phase-B Study is next, which focuses on a "Preliminary Design" for a
  397. selected concept to meet the design requirements established in Phase
  398. A.  Critical technologies should be identified and demonstrated.
  399. Finally a Phase C/D "Design, Development, Test, and Engineering"
  400. contract is awarded, which leads to a flight article.
  401.  
  402.             (Continued -- my apologies, but the software I'm using
  403. only allows uploads of 60 lines or less.  This was split into 7
  404. messages.)
  405.  
  406.  
  407. --- Opus-CBCS 1.10
  408.  * Origin: Universal Electronics, Inc. (1:103/302.0)
  409. --  
  410. Wales Larrison
  411. ...!{dhw68k,zardoz,lawnet,conexch}!ofa123!Wales.Larrison                             Wales.Larrison@ofa123.FIDONET.ORG
  412. 714 544-0934 2400/1200/300
  413.  
  414. ------------------------------
  415.  
  416. End of SPACE Digest V11 #255
  417. *******************
  418.